Home › Post-Construction Cleaning
Post-Construction Cleaning in Dallas, TX
Rough, final, and touch-up post-construction cleaning across the Dallas metro. Priced by the square foot from $0.30, with the number firm before we schedule.
- Fully Insured
- Residential & Commercial
- Free Estimates
- Transparent Pricing
- Local Dallas Crew
What Post-Construction Cleaning Covers in Dallas
Newly built, remodeled, and renovated properties across Dallas, from Uptown high-rise units to renovations in Lakewood and the M Streets. Construction dust comes off every surface, light debris gets cleared, and the things trades leave behind get detailed. Floors, cabinets, fixtures, trim, baseboards, kitchens, and baths. Labels and adhesive come off. The property ends up ready for inspection, handoff, or move-in.
This is not house cleaning done harder, and hiring a janitorial crew for it usually costs a Dallas contractor a second visit. Gypsum dust is the reason. Visible particles take 24 to 48 hours to settle, and the fine dust from drywall sanding can stay up for days. A crew that wipes surfaces before the air clears watches the same dust land again. The order is fixed, the equipment is different, and the timing accounts for dust that has not come down yet.
Our Dallas work runs across new homes in Trinity Groves, adaptive reuse in Deep Ellum and the Design District, and renovations in Oak Cliff, Preston Hollow, and Bishop Arts. Most jobs book a final detail clean. Phased builds add a rough clean partway through.
Signs You Need Post-Construction Cleaning in Dallas
- Trades are wrapping up and a walkthrough or inspection is booked
- Drywall dust keeps coming back after your own crew wipes it down
- Glass still has stickers, adhesive, paint specks, or overspray on it
- Floors have adhesive, grout haze, paint drops, or film residue
- Cabinets, drawers, and closets still have sawdust inside them
- The HVAC ran during the build and dust got into the ductwork
- A buyer or tenant is walking the property this week
Our Post-Construction Cleaning Process in Dallas
Scope and quote
Send us the square footage, the stage the job is at, and your handoff date. Most Dallas quotes go out the same day. The number is firm before we book anything.
Debris out first
Big waste leaves before we start cleaning. Cleaning around a pile of debris just moves the same dust twice.
Top down, every time
Ceilings, fixtures, ledges, and vents first. Then walls. Then floors. Working top down once beats working at random three times.
The detail pass
Cabinets inside and out. Fixtures, trim, baseboards, doors, and frames. Kitchens and baths. Labels and adhesive come off.
Walkthrough before we go
You walk the Dallas property with us before we leave. Anything you flag gets fixed on the spot, not on a return trip.
Post-Construction Cleaning Prices in Dallas
We price by the square foot of the area we clean. No call needed to get a number.
| Clean type | Rate | Best for |
|---|---|---|
| Rough clean | $0.30 / sq ft | Mid-build, before finishes go in |
| Final detail clean | $0.75 / sq ft | After trades are out |
| Touch-up clean | $0.20 / sq ft | Last pass before walkthrough |
What Moves the Price
- Square footage, and how many floors we cover
- Project stage, and how much dust is still on site
- Finish types, since some surfaces need slower work
- Age of the property, since older Dallas homes need a second pass
- Whether you add glass, ductwork, or debris hauling
We charge $25 per window for window cleaning, $50 per vent for air duct cleaning, and per load by material for debris removal. Book one or book all four on one schedule.
Post-Construction Cleaning Questions We Get in Dallas
What does post-construction cleaning consist of?
Removing construction dust and light debris, then detailing what trades leave behind. Floors, cabinets inside and out, fixtures, trim, baseboards, doors, kitchens, and baths. Labels, stickers, and adhesive come off. Then a final touch-up so the property is ready for inspection, handoff, or move-in.
What are the three stages of post-construction cleaning?
Rough, final detail, and touch-up. A rough clean happens mid-build at $0.30 per square foot, clearing early debris so trades are not working in a mess. A final detail clean happens after trades are out at $0.75. A touch-up clean is the last pass before a walkthrough at $0.20. Phased builds usually need all three.
How much does post-construction cleaning cost in Dallas?
A rough clean is $0.30 per square foot. A final detail clean is $0.75. A touch-up clean is $0.20. On a 2,500 square foot Dallas job that works out to $750, $1,875, and $500. Square footage, project stage, and site condition set the final price. The quote is free.
What is the difference between a rough clean and a final clean?
A rough clean happens while trades are still on site. We clear early debris and knock the dust down so the next trades are not working in a mess. A final clean happens after trades are out. That is the detailed pass: every surface wiped, labels and adhesive off, kitchens and baths detailed, floors last.
Do you clean during the build or only at the end?
Both. We book rough cleans mid-project and final cleans once trades clear out. On phased Dallas builds we often run several visits instead of one big clean at the end.
My Dallas project is in an older home. Does that change the job?
Yes. Original wood and plaster need gentler products, and they usually need a second pass. Tell us roughly when the house was built when you ask for a quote. If it went up before 1978, the renovation falls under federal lead rules, and those rules put a verification step after the cleanup.
What are common post-construction cleaning mistakes?
Cleaning too early is the big one. Fine drywall dust can stay airborne for days, so wiping surfaces before the air clears means doing it twice. After that: working bottom up instead of top down, leaving grout haze past the 24 to 72 hour window when it starts to cure, using aggressive products on original finishes, and ignoring the ductwork so dust comes back after move-in.
What chemicals are needed for post-construction cleaning?
It depends on the surface, which is why one all-purpose spray does not cover it. A typical job needs a pH-neutral cleaner for tile and stone, an adhesive remover for labels and protective film, a grout haze remover, and a non-abrasive solvent that is safe on glass. Aggressive removers can discolour finishes, so we test on a small area first.
What is the best cleaner for post-construction dust?
There is not one, and that is the point. Fine dust comes off mechanically, not chemically. A vacuum with fine-dust filtration lifts it out of the room instead of pushing it around, then microfibre picks up what is left. Spraying cleaner onto heavy dust turns it into a smear.
Do you bring your own equipment?
Yes. Our crews arrive with what the job needs. That includes vacuums with fine-dust filtration and the solvents that take adhesive and labels off without damaging the surface.
Are you insured?
Yes. ConstructionCleaningDallasTX carries general liability and workers compensation cover. We send current certificates before our crew starts work. Most Dallas general contractors ask for them first.
Get a Free Post-Construction Cleaning Quote in Dallas
Send us the square footage, the stage the job is at, roughly when the property was built, and your handoff date. We come back with a firm number, usually the same day.
